EPIM 3.0.5: move task into another list

Discussion of EssentialPIM for Android and synchronization
Post Reply
Georgo2010
Guru
Posts: 695
Joined: Tue Oct 19, 2010 2:20 pm
Location: Czech republic
Has thanked: 32 times
Been thanked: 54 times
Contact:

EPIM 3.0.5: move task into another list

Post by Georgo2010 »

If i want to move task from one list into another list, then I open context menu, choose item "Move into list.." and destination list. Current task is moved into the selected list, that's all right. But why I see destination list instead of source list? It's very tiring to constantly switch into the original list. Can you please confirm this issue?

Suggestion:
Optionally allow automatically return to the original list after the move task to another list.
Jiri Humplik
main czech and slovak translator (epim.preklad@gmail.com)
http://www.epimcz.wbs.cz

MS WIN10 Home 64-bit @150 dpi: EssentialPIM Pro Portable 8.5
Xiaomi Redmi 4X, Android 7.1.2, MUIU 10.3.1.0: EssentialPIM Pro 5.6.2
admin
Site Admin
Posts: 17172
Joined: Thu Nov 25, 2004 3:12 am
Has thanked: 1616 times
Been thanked: 1134 times

Re: EPIM 3.0.5: move task into another list

Post by admin »

This is by design. If more people request that, will make such an option. Thanks.
Android version of EssentialPIM. Keep all your data in sync!
Georgo2010
Guru
Posts: 695
Joined: Tue Oct 19, 2010 2:20 pm
Location: Czech republic
Has thanked: 32 times
Been thanked: 54 times
Contact:

Re: EPIM 3.0.5: move task into another list

Post by Georgo2010 »

admin wrote:This is by design. If more people request that, will make such an option. Thanks.
This way (design) is very tiring, because after move task into another list I see target list and I must jump back into source list again and again after each move :(
Jiri Humplik
main czech and slovak translator (epim.preklad@gmail.com)
http://www.epimcz.wbs.cz

MS WIN10 Home 64-bit @150 dpi: EssentialPIM Pro Portable 8.5
Xiaomi Redmi 4X, Android 7.1.2, MUIU 10.3.1.0: EssentialPIM Pro 5.6.2
mattz
Guru
Posts: 271
Joined: Wed Nov 06, 2013 3:08 am
Location: New Hampshire USA
Has thanked: 5 times
Been thanked: 54 times

Re: EPIM 3.0.5: move task into another list

Post by mattz »

Seems to me, the intention here is to stay with the item being moved... which makes sense to me... I'd be more confused if after placing an item I was sent back to original list and who knows which item... having said that, I think that whichever behavior is programmed, it should be consistent throughout the app.

HTH,
Matt Z.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
EssentialPIM Pro Portable 6.0 beta1 on Win7 Home Premium 64 bit SP1
EssentialPIM 3.0.5 on Android 4.1.2 (LG Optimus F3 - T-Mobile)
admin
Site Admin
Posts: 17172
Joined: Thu Nov 25, 2004 3:12 am
Has thanked: 1616 times
Been thanked: 1134 times

Re: EPIM 3.0.5: move task into another list

Post by admin »

Georgo2010, we are going to introduce a feature that will allow selection of multiple tasks. This will allow you to move as many tasks as you wish at once and you do not need to go back to the initial list then.
Android version of EssentialPIM. Keep all your data in sync!
Post Reply