how to combine the Notes in A.epim into B.epim
Moderators: Max, TerryRogers
how to combine the Notes in A.epim into B.epim
how to combine the Notes in A.epim into B.epim?
lost some tasks when change to 3.2RC1,so I need to go back to the backup file B.epim.
while many notes change in the A.epim,now I want to combine the Notes in A.epim into B.epim?
lost some tasks when change to 3.2RC1,so I need to go back to the backup file B.epim.
while many notes change in the A.epim,now I want to combine the Notes in A.epim into B.epim?
-
- Site Admin
- Posts: 21714
- Joined: Wed Dec 08, 2004 11:39 pm
- Has thanked: 819 times
- Been thanked: 364 times
- Contact:
Re: how to combine the Notes in A.epim into B.epim
Hi,
actually no Task should be lost. Today we made a silent update fixing problem with showing them. So if you redownload, you should see all Tasks.
You can combine Notes if you use EPIM Sync (you can turn off synchronization of all other modules if you do not need to combine data in them). Trial of EPIM Sync includes 2 full synchronizations, let me know if you need more.
actually no Task should be lost. Today we made a silent update fixing problem with showing them. So if you redownload, you should see all Tasks.
You can combine Notes if you use EPIM Sync (you can turn off synchronization of all other modules if you do not need to combine data in them). Trial of EPIM Sync includes 2 full synchronizations, let me know if you need more.
Maxim,
EPIM Team
EPIM Team